Parking Ramp
by
admin
—
last modified
Jun 11, 2009 02:14 PM
Built in 2007, the High Avenue parking ramp was the first step in the University’s long-term plan to relieve the parking shortage on campus.
The first-ever built at a UW System comprehensive university, the three-level ramp contains 448 stalls. The first two levels are reserved for faculty, staff and commuter students while the third is available to students living in residence halls.
Further plans include an additional parking ramp on the north side of campus. Construction is scheduled to begin in 2011.